Studio Update
The studio I am having built is coming along well. It is all up, wired, walled and painted inside, built-in shelves and work bench built, and mini-split heat pump installed. The exterior has to be painted still, the stairs, rails, shelves, and bench need to be stained, the lights need to be installed, and the permanent electric needs to be hooked up (they dug the trench for the wires today). I am guessing it may be done this week, if the weather cooperates. Otherwise, next week. Pics will follow after it is done and I have moved in a few things.
Merry Christmas to me!!